Cost & process

How Myko quotes.

Every building is different, so every quote is priced case by case after an assessment. No rate card, no phone estimates, and no number until we have seen what we are treating. Here is exactly what shapes the figure and what you receive.

What shapes the quote

Six things determine what a building costs to treat.

None of them can be judged over the phone, which is why the assessment comes first.

  • Treated volume, not floor area. Diffusion fills a space, so ceiling height matters as much as footprint. A high-bay warehouse and an office of the same floor area are not the same job.
  • Scope. Airborne treatment, surface treatment, or both. Surface work is shaped by how much is affected and how accessible it is.
  • Install complexity. How readily the building can be fitted out, and how many diffusion points its layout needs, changes the install.
  • Building conditions. HVAC layout, ceiling voids, occupancy and moisture history all affect where the system goes and how often it needs to run.
  • Documentation. Baseline and post-treatment readings with a written report add to the scope, and are usually worth it where insurance, WHS or accreditation are involved.
  • Run schedule. How often the system cycles is set to the building’s risk. A high-humidity aged-care facility runs harder than a temperate office.

What you receive

A fixed price, in writing, within a business day.

1

Assessment

A walkthrough with your facilities lead at no cost. We look at the building, the complaint and moisture history, and take a baseline reading.

2

Written quote

A fixed-price quote with the scope itemised — which zones are covered, the run schedule, servicing, and what reporting is included. Issued within one business day.

3

No surprises

The price does not move unless the scope genuinely changes, and then only with your written approval. If the job is smaller than you feared, the quote says so.

Common questions

Questions about cost.

Why don’t you publish prices?
Because a number without the building attached to it would be misleading. Treated volume, building layout, HVAC configuration, how many diffusion points a site needs and what reporting you require all move the scope significantly. We assess first, then quote a fixed price in writing.
Is the quote fixed or an estimate?
Fixed. After assessment you receive a written, fixed-price quote with the scope itemised. It does not move unless the scope genuinely changes, and then only with your written approval.
Do you charge for the assessment?
No. The site assessment and the written quote that follows are free. Where formal laboratory testing is requested, that is quoted separately and transparently before anything is carried out.
How quickly do I get a number?
Within one business day of the assessment. Urgent situations in occupied buildings are prioritised.
How is it priced — per visit or annually?
Annually. There are no callouts to price, because the system is already running. The figure covers the system, its consumables, scheduled servicing and the monitoring and reporting layer.
Do you price by floor area or by volume?
By treated volume. Diffusion fills a space, so ceiling height matters as much as footprint. A high-bay warehouse and an office of the same floor area are not the same job.
Fixed-price quote

Tell us about the building and we’ll price it properly.